The hiding power of bright red, burgundy, yellow, orange and green colors is slightly worse, so usually applying two layers is not enough. In this case, it is recommended to apply a lighter shade with a better hiding power as the first layer, and then apply another 2 coats of the selected color shade. The perfect final look is achieved by following the instructions. Depending on the absorption and roughness of the surface, as well as the effect of light, the color of the coating after application may differ from the initially chosen tone. When choosing a color shade, it is recommended to select lighter tones, providing a longer color film service life. Stains from the coating can be removed with a soft cloth and light non-abrasive cleaners.
Application
Before applying Belinka siloxane facade paint, you must prepare the surface accordingly. Fresh concrete or freshly applied plaster should be dry well before painting. Before applying siloxane facade paint, surfaces should not be treated with Belinka universal acrylic primer. It should be cleaned with a brush and / or washed with water. Old cracked or flaking coatings must be removed to a solid base. It should be noted that it is completely dry. Thus, the surface is treated with a universal acrylic primer. Wall surfaces contaminated with mold or fungusbefore applying the primer should be treated with Belinka mold remover. After drying, dead fungi and mold are mechanically removed. Mix well before applying. If necessary, dilute with water by 5-10%. Sprayed on a surface of 2 layers Air temperature should not be below + 5 ° C, it should not exceed 80%. Paint should not be applied during rain, fog or strong wind. It will affect the weather.Under normal conditions (20 ° C and 65% relative humidity), it can be applied in 10-12 hours. At low temperatures, the drying time increases. Drying time also increases with relative humidity. The tool after work is cleaned with water.
Specifications
Ingredients : siloxane emulsion and acrylate copolymer, pigment, additives and water. Application method : brush, roller, spraying. Recommended number of layers : 2 Consumption : 1 liter for 4-5 m 2 of a smooth base when applied in two layers. When coating highly absorbent and rough bases, consumption increases. Drying time before use (20 ° C and relative air humidity of 65%), 10-12 hours. Storage : in its original packaging at a temperature of + 5-30 ° C. Prevent freezing! Package : 2 l and 10 l